FLAT FLOORS CLEAN DEADLINES
Baufinal runs the entire finishing phase — lightweight concrete, screed, industrial floors, plastering and epoxy. By machine, to standard and on schedule, so tilers, parquet layers and painters start right behind us — no corrections. Since 2007, on 30+ major buildings.
Free site visit · written quote in 48 hours · no obligation
Building an apartment, a residential block or a hall? We take over the entire flooring phase — A to Z.
FOUR STEPS. A CLEAR PROCESS.
THE WHOLE PACKAGE, OR JUST
THE PHASE YOU'RE MISSING.
OUR PROCESS
CALL & SITE VISIT
Book a free site visit →
- Free visit — we measure everything
- Review of plans and substrates
- You do nothing
WRITTEN QUOTE IN 48H
Request a quote →
- Item by item, in black and white
- Material and labour, no hidden items
- Deadlines per site phase
- No addendums, no fine print
MACHINE EXECUTION
See our services →
- Truck pumps — even to the 20th floor
- Our own crews, no subcontractors
- Lightweight concrete and screed as one package
- Sections by zone, no downtime
- Pace aligned with the other crews
- A clean site behind us
VERIFICATION & HANDOVER
See our projects →
- Flatness is measured, not eyeballed
- Ready for the next crew
Cement and anhydrite screed, 2–8 cm, machine-installed — a base that parquet and tiles sit on without a single bag of levelling compound.
FLAT. QUIET. ON TIME.
The floor never shows up in renders, but you live on it every day: it carries the parquet, silences sound between storeys and holds the heat of underfloor heating. That's why developers building for buyers — from Marriott to Park Residence — give the flooring phase to one company that answers for it.
RESULTS ARE MEASURED, NOT TOLD

FIVE DISCIPLINES.
ONE RESPONSIBILITY.
With every finishing layer in one contractor's hands you get a floor that is flat, quiet and done on time — and one person who answers for it.
SCREED
+
Cement and anhydrite screed, 2–8 cm. Machine installation means the same flatness on the first square metre and the last — including over underfloor heating, where layer thickness decides the heating bill. Bad screed is invisible until it's too late; ours is measured before handover.
Quote for screed →LIGHTWEIGHT CONCRETE
+
Fills over installations, levelling and slope concrete on roofs — densities from 600 kg/m³, installed by truck pumps straight to the storey. No hauling through staircases, no blocking the crane, no crowding the site.
Quote for lightweight concrete →INDUSTRIAL FLOORS
+
Reinforced industrial floors engineered for forklifts, racking and constant traffic — over 60% of all industrial flooring is exactly this system. We also work in phases while your hall keeps running.
Quote for an industrial floor →PLASTERING
+
Machine plastering of interior walls — flat surfaces without waves, sharp corners and reveals. The same quality on a 50 m² apartment and a 20,000 m² hotel.
Quote for plastering →EPOXY FLOORS
+
Seamless epoxy finishing layers for garages, production and spaces that must take chemicals, oils and wear — and stay easy to maintain.
Quote for epoxy →PROJECTS
International chain hotels, residential complexes, shopping malls and mountain resorts — from the Marriott in central Sarajevo to Vučko on Jahorina. Our floors carry buildings that thousands of people move into. See where we've left a flat trace.
Park ResidenceCrni Vrh · residential
New reference
Roof GardensTrebević · lifestyle
New reference
Moj KvartDolac Malta · residential
New reference
Vučko ResidenceJahorina · apartments
SOME OF THE REGION'S
BIGGEST WORK WITH US
Developers and brands we work with





WHAT EVERYONE ASKS US
It depends on thickness, material, floor level and site access — a ballpark figure over the phone would be a lie. So we visit the site for free, and within 48h you have an exact written quote, item by item.
Yes. Machine installation pays off even on an apartment, and you get the same quality hotel developers get. There is no minimum area — call us.
Yes, we work across all of Bosnia and Herzegovina — Delta Planet in Banja Luka stands on our screed.
As early as possible — slots fill up with site phases. But even when a deadline is burning, call: sometimes that's exactly when we can help.